UA-91961844-1
top of page

Manor West River

Location: Tampa, Florida

Award: Lower Carbon Concrete


Project Team

Owner: Tampa Housing Authority

Contractor: Balfour Beatty

Architect: MSA Architects

Engineer: McNamara/Salvia Structural Engineers

Concrete: Maschmeyer Concrete Company Slag Cement: Argos



Located in Tampa, FL, USA, this multi-family project is currently under construction in the West River neighborhood along the Hillsborough River. The complex will feature an eight-story mid-rise apartment building with 360 units, high-end finishes, and amenities including a pool, fitness center, and clubhouse. The project will also include an eight-level parking garage with 530 parking spaces.


Slag cement was selected for the concrete mixture, to increase its pumpability, workability, and durability as well as provide a low carbon mixture. The mixture provided the contractor with adequate workability and setting times, and it met strength requirements.


Application Type

Application Type

Foundations

% Slag Cement Replacement

50%

% Portland Cement


% Portland Limestone Cement

50%

% Other SCM (if applicable)


Aggregate

No. 57 limestone

Water/cement ratio

0.42

7-day strengths

5,700 psi

28-day strengths

7,710 psi



Application Type

Columns

% Slag Cement Replacement

50%

% Portland Cement


% Portland Limestone Cement

50%

% Other SCM (if applicable)


Aggregate

No. 89 limestone

Water/cement ratio

0.42

7-day strengths

6,740 psi

28-day strengths

9,280 psi



Application Type

Shear Walls

% Slag Cement Replacement

50%

% Portland Cement


% Portland Limestone Cement

50%

% Other SCM (if applicable)


Aggregate

No. 89 limestone

Water/cement ratio

0.35

7-day strengths

8,040 psi

28-day strengths

10,350 psi


Comments


bottom of page